Forest Glen Bridge
A two-lane highway bridge in Forest Glen exhibited the following issues in need of repair:
- Damaged bridge pier
- Spalled concrete on spandrel walls
- Spalled concrete at guardrail post base in top of spandrel wall
Bulley & Andrews Concrete Restoration provided the following services to repair the damage:
- Repaired the damaged areas of the bridge by casting a new column core and replacing the pre-cast sections. The patching concrete was made to match the surrounding areas.
- Removed the guardrail embedment and patched it to match the surrounding, creating a seamless effect.